Tools
Project management calculator — Malaysia
12 of them, free, no sign-up, nothing to download. Most are the scheduling, estimating and risk arithmetic every project manager needs occasionally. The HRD Corp levy calculator is the one your finance team will ask about.
- Documents
Project charter template
Fill in the sections and the finished charter builds beside you. It shows what is still missing, flags dates that contradict each other, and exports to Word, PDF or text.
Open → - Risk
Risk assessment matrix
A 5x5 heat map with a risk register beside it. The default bands are the ones in Malaysia’s DOSH HIRARC guideline, and you can switch them.
Open → - Roles
RACI matrix generator
Assign R, A, C and I across tasks and roles. It checks the one-accountable rule, flags gaps, and exports to Excel, PNG or a pasteable table.
Open → - Scheduling
Gantt chart generator
Tasks, durations and dependencies drawn as a Gantt chart with the critical path, float and real calendar dates. Download as a PNG or a CSV for Excel.
Open → - Malaysia
HRD Corp levy calculator
Your levy from headcount and payroll, what two years of it comes to, how much the forfeiture rule puts at risk, and what the balance buys in training.
Open → - Estimating
Cost calculator
Three-point (PERT) estimating per line item, with confidence ranges and a contingency-loaded budget. Deviations combine in quadrature, not by addition.
Open → - Business case
ROI calculator
Net benefit, ROI percentage, payback period, NPV at your own discount rate, and the benefit–cost ratio.
Open → - Risk
Risk calculator
Expected monetary value per risk and in total, handling threats and opportunities, with a 1–25 score for ordering the register.
Open → - CPM
Critical path calculator
Forward and backward pass across a task list: earliest and latest start and finish, float on every task, and the shortest possible duration.
Open → - Schedule
Timeline calculator
The same network mapped onto real calendar dates, counting working days. Weekends excluded; public holidays deliberately are not.
Open → - Diagram
Network diagram
Paste a task list and see the dependency network drawn, with the critical path highlighted and nodes positioned by earliest start.
Open → - EVM
Earned value calculator
CPI, SPI, cost and schedule variance, estimate at completion, estimate to complete and TCPI — from four inputs, with every formula shown.
Open →